Floor Socket Barrier

Extrait du fichier (au format texte) :

Instructions - Floor Socket Barrier

Barriers are supplied in packs of two, complete with an Allen key for assembly.
1. Mark out the position of the sockets. Normal spacing is approx' 2.5mtrs between posts,
but this can be increased to 3mtrs on occasion, so long as the tension on the cord is sufficient to maintain a straight and level line.
2. Drill the holes in the floor surface using an appropriate masonry drill to produce a clean lipped hole 28mm to 30mm dia' and approx' 73mm deep and clear the hole of any dust or debris.
3. Tighten each upright firmly into its socket.
4. To get the best from this equipment we recommend installing the sockets with the uprights inserted to ensure the cord slots at the top of the post are correctly aligned.
5. Apply an epoxy resin to the base and sides of the hole and insert the socket, being sure to bed it down' by using small backwards and forwards rotational motions to assist the movement of the resin.
6. If required carefully apply additional resin to any gap at the top of the socket to ensure that the finish is flush with the floor and clean off any excess resin that squeezes out.
7. Use a spirit level to check that the upright it is absolutely vertical, and if necessary support in this position whilst the resin cures.
Then, when the resin is cured, for PPC barriers, follow these guidelines...
8. Remove the top caps using your finger or a small screwdriver and tie a simple granny'
knot in the end of the elasticated cord. Pull it very tight and cut off any excess cord close to the knot.
9. Push the knot into the recess in the top of the upright with the cord exiting through one of the slots and replace the cap.
10. Pull the cord tight to the next barrier with enough tension to make a straight line and push into the slots: straight across if it is a straight line or at right angles if it is at a corner.
11. Repeat step 9 for the last barrier or use a wall terminator.
Note: In an installation where the object is completely surrounded, instead of two separate knots tie the two ends together with a reef knot, pull very tight and cut off the ends. If required, cut off one of the cap legs to accommodate the size of this knot.
A line of barriers can also end with the cord returning to the wall by using a wall terminator.

Dans la boutique



Floor Socket Barrier
Floor Socket Barrier
26/08/2024 - www.absoluteproduct.com
Instructions - Floor Socket Barrier Barriers are supplied in packs of two, complete with an Allen key for assembly. 1. Mark out the position of the sockets. Normal spacing is approx' 2.5mtrs between posts, but this can be increased to 3mtrs on occasion, so long as the tension on the cord is sufficient to maintain a straight and level line. 2. Drill the holes in the floor surface using an appropriate masonry drill to produce a clean lipped hole 28mm to 30mm dia' and approx' 73mm deep and clear the...

Absolute Art Hanging Track Explainer
Absolute Art Hanging Track Explainer
26/08/2024 - www.absoluteproduct.com
A RT H A NG I N G TRAC K EXP LA INED ST E P 1: A SSE SSIN G T HE INSTAL L AT ION S ETTING Before you can select a track (rail), you need a clear picture of the installation setting. You can use Important: No matter the material strength of the art hanging track, it must rely on the structure of the below as a checklist and send it back to us for tailored advice, or you can compare your list to the wall to stay in place. To safeguard valuable artworks, know what's in the wall or ceiling. the...
 

Flexoutuile d'Onduline : l'étanchéité des toitures
Flexoutuile d'Onduline : l'étanchéité des toitures
25/11/2010 - www.n-schilling.com
N0212-15 Onduline 10/01/03 12:00 Page 2 janvier 2003 Flexoutuile d'Onduline : l'étanchéité des toitures "tuiles canal" en toute sérénité D La nouvelle plaque Flexoutuile Tradiflex d'Onduline (pour la pose à 2 tuiles) : économie, facilité de mise en oeuvre pour une étanchéité totale des toitures en tuiles canal. E Avec un succès jamais démenti, l'offre Onduline se fait aujourd'hui plus complète et aboutie proposant ainsi deux nouvelles familles de plaques de sous-toiture pour tuiles...


28/09/2024 - www.vescom.com
Résumé en cours de création pour ce fichier PDF


28/09/2024 - www.vescom.com
Résumé en cours de création pour ce fichier PDF

2019 05 02 Pr Nexans Q1 2019
2019 05 02 Pr Nexans Q1 2019
19/08/2024 - www.nexans.com
PRESS RELEASE 2019 FIRST QUARTER FINANCIAL INFORMATION " Consolidated sales for first quarter 2019: 1,664 million euros, up +7.7%1 on an organic basis compared to first quarter 2018 " +10.1% organic sales growth for cable and wire activities2, reflecting a buoyant start to the year " A sharp -8.0% contraction in sales for the High Voltage & Projects segment, reflecting low industrial workloads for land high voltage projects (with sales down -21.1% for that sector), and a -2.4% sales decline...


28/09/2024 - www.vescom.com
Résumé en cours de création pour ce fichier PDF

Support De Vmc Réglable Ou Monobloc
Support De Vmc Réglable Ou Monobloc
01/07/2024 - www.cheneaux-metalliques.fr
STRUCALTOP support de Vmc acier monobloc